Design and size heated and cold water services and systems - Part 3 - Hydrants and Hose Reels

Pricing

29.50AUDIn Stock
Learner Guide: $29.50 Add To Cart
Preview
  • PDF thumbnail

Description

This section addresses the skills and knowledge required to plan, size and layout fire hydrant and hose reel systems to suit various site conditions, codes and authorities’ regulations. It looks at building classification and building hazard ratings which must be identified prior to designing fire hydrant systems.

Classifications

AQF - Australian Quality Framework
Certificate IV

Competency Field
Building and Construction

National Code - Training.gov.au
CPCPWT4011B: Design and size heated and cold water services and systems

Copyright Description

Copyright © 2019 TAFE SA, Government of South Australia. All rights reserved. Terms and conditions apply.

Catalogue Item

TAFEshop Identifier: TAFESA-1818

TAFEshop Catalogue: 10.065.2464-E1

TAFE SA

Related Resources


Refrigeration and Air Conditioning series - DVD 8

This DVD is a compilation of the following titles: Refrigeration and Air Conditioning: Food Storage Conditions, Industrial Refrigeration, Air Conditioning Commissioning, Refrigerant Recovery, The Conversion Factor, 123 – The Chilling Factor and The Conversion Factor (Thai). Total Run Time = 1 hour 50 mins. This training resource was prepared for use in conjunction with a formal training program for delivery in South Australia and was correct at the time of preparation.

DVD$16.95

Refrigeration and Air Conditioning series - DVD 4

This DVD is a compilation of the following titles: Refrigeration and Air Conditioning; Driers, Evacuation, Thermostats, Refrigerant Charging, Relative to What, Air Conditioning, Fan Installation, Sounds like Noise, Doing it Right and The Trouble Shooters. Total Run Time = 1 hour 25 mins. This training resource was prepared for use in conjunction with a formal training program for delivery in South Australia and was correct at the time of preparation.

DVD$16.95

Refrigeration and Air Conditioning series - DVD 2

This DVD is a compilation of the following titles: Refrigeration and Air Conditioning: Instruments (Air Flow Measurement), Copper Tube work (Cutting and Bending), (Silver Brazing), (Flaring and Swaging), Fitting Gauges, Leak Detecting, Heat and Pressure, Marking Out Sheet metal and Cutting and bending sheet metal. Total Run Time = 1 hour 45 mins. This training resource was prepared for use in conjunction with a formal training program for delivery in South Australia and was correct at the time of preparation.

DVD$16.95